This page contains the text of the IAF Ticket, relevant links, and Disposition information and status.
Ticket Metadata
Ticket # | 527461 |
Date Received | 13 June 2013 |
Topic Title | Clarify application processes |
IAF Document | IAF-1400 |
IAF Document Version | v3.0 |
Status | Disposed |
Links to Meetings | DRAFT IAWG Meeting Minutes 2013-08-1 |
Final Disposition | Add to IAF enhancements list |
Ticket Text
Ticket # 527461
The process below does not clearly state if the ARB must vote to accept an application and list it as registered applicant or if the application can be accepted by the secretariat upon performance of review that the application is not a wast of time (so far out of scope or not aligned with mission). I apologize for the line numbers but the below, I believe, references the section where the clarification is needed. Could you please ensure this is entered as a change request for the AAS officially? Thank you! Quoting from AAS v3-0: 6.7 Specific Evaluation Steps 651 The Secretariat will validate the initial Application submission up to and including Part I clause 652 4.1, step 9. 653 Where the Application is for a Full Service Approval, the Secretariat will ensure that the overlay 654 of the collective criteria covered by the combination of the Applicant