Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page summarizes and Following are links to the conformance test plan materials that contributed by Cordny Nederkoorn has been preparing to the UMA WG as part of the UMA validation bounty program. These materials are in draft form and may change. Ultimately we may turn them into UMA "working drafts".

...

The final versions of these documents were submitted as of 12 Dec 2010.

Additional conformance issues noted by Cordny:

  • Whether Claims 2.0 questions support is required (relates to step 2)

Ultimately the group may turn these contributed materials into UMA "working drafts".