Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 64 Next »

Summer Project 2020 Description

In this new work stream the consent receipt is being updated in content and name in accordance with the new ISO standards and drafts as a Notice Receipt (NR). The consent receipt work was written over the last 5 years and is included as an Appendix B in the ISO 29184 Online Privacy Notices and Consent standard, which was just published in June 2020.   The work will align with  this standard and the consent receipt work in the ISO SC 27 which has announced the 27560 Consent Record Information Structure (Working Draft 1 so its early in the standard process) which complements ISO 29184.  The information structure in the Consent Receipt (CR) v1.1 is the starting point.   

Our summer project will take the need for Digital Ledger Consent (DLC) as a touchstone use case for what we are referring to as the Notice & Consent Project Reference Implementation.  It will build on the existing ISO/Kantara standards (Consent Receipt 1.1 and ISO 29184) as a contribution for the next drafts and eventually the ISO 27560 Consent Record Information Structure standard.  It doing so we plan to evolve the CR 1.1 to Notice Receipt (NR) 1.2 and then NR 1.3. We than plan to share the NR as a Kantara Specification and then make then available to the wider consent and notice ecosystem.

We are going to make a push to put into place this work as the basis for new global standards and technologies with a reference implementation that works across and is consistent with global notice and consent efforts.  A first set of outputs will take place by July 10th (see timeline below).  We then plan to host a mid-summer workshop to  introduce these on July 15th.  Following on the workshop we plan to publish as a specification a notice structure that can be used in the DLC reference implementation.   

Technical Alignment for the Summer Project

Aligning  with the NR v 1.2 and 1.3 with - 

  • Hyperledger Lifecycle of a digital ledger consent record v0.9
  • W3C DPVC CG v0.1: https://www.w3.org/ns/dpv
  • Decentralised Semantics; Open Data Capture Architecture (TBC)
  •  UBC: Assessment of technical alignment and standards for GA4GH focused blockchain project

Time Line

July 10th - ISO 27560 WD 1 inputs due, NR 1.2 draft ready for review

July 15th - Mixer - 1pm CET - 4pm CET - invite to show off inputs, and to setup July 20th 

July 20th - Hacking on the update to the NR 1.2 Reference implementation and present 1.2  to ISI WG and report out on status of the summer project -  

Aug 15th - Present NR 1.3 to the ISI workgroup

Sept - Report and Next Steps 


Technical Alignment for the Summer Project

Aligning  with the NR v1.3 -with -  (among others...)

  • Hyperledger Lifecycle of a digital ledger consent record v0.9
  • W3C DPVC CG v0.1: https://www.w3.org/ns/dpv
  • Decentralised Semantics; Open Data Capture Architecture (TBC)
  • UBC: Assessment of technical alignment and standards for GA4GH focused blockchain project.3
  • Linux Foundation Trust Over IP Decentralized Semantics Workgroup


  • No labels