Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Legend:

The Action Item (AI) number is the date the AI was assigned, followed by the number allocated to it in the meeting

OBE = Overcome By Events 

Action Item

Assigned to

Status

Description

Comments

2009-12-02-01

Colin W Joni B

Closed

Propose new (monthly) call time

WG settled on 1st Monday except Jan 2010 (and possibly others as req'd)

2009-11-04-01

Colin W

Open (in progress)

Analyse IC and Open ID profiles

Call for volunteers to contribute and peer review

2009-11-04-02

Joni B

Open

Follow up possible demo of the Fraunhofer presentation for KI-wide consumption

Fulup to provide Joni with another contact

2009-11-04-03

Fulup A F

Open

Follow up with Gael to get (and share) best link for Orange's new login page

Non customers cannot view plage. Fulup requesting video or screen shots

2009-11-04-04

Joni B

Open

Follow up with Dervla re Villmora, Portugal as possible future F2F location (off season)

 

2009-10-07-1

Colin W

Closed

Expedite Vice/Co-Chair progress

Fulup nominated. Ballot in progress.

2009-10-07-2

Colin W

Open

Work with Kyle/DGI on a schedule for eGov SAML 2.0 Profile V.20

BoT preparing Interop strategy. DGI
maintaining an observer role at present pendng outcome

2009-10-07-3

Colin W

Closed

Circulate sverre Bauck's problem statement(s) on eProcurement identifiers and attributes in Digital Certificates

With LC for Chair review. Some aspects may be taken on by P3WG.

2009-10-07-4

Colin W
Bob S

Closed

Check if Govt of BC, Canada intending to deploy IC/IMI

Update email circ'd to group 22nd Oct 2009.

2009-10-07-5

Scott S

Closed

Approach Drummond Reed of ICF re any known/intended delpoyments
of IC/IMI in Gov

Drummond responded with info on UK and NL govs

2009-09-16-1

Soren P

Open

Reference Danish ID-WSF project as the use case to determine if
the ID-WSF Interaction Service can offer stronger privacy protection,
or not

 

2009-09-16-2

All

Open

eGov to develop MRD for an eGov profile of ID-WSF or similar to
submit to ID-WSF Evo by May 2010

Related to AI above.  Need to determine demand before start

2009-09-16-3

Robin W

Closed

Supply CW the link to the FIDIS Identity Reloution use cases (as a
precursor to CW inputting material to an an 'all-Kantara' use case suite 

 

2009-09-16-4

Robin W/
Colin W

Ongoing

Swap contacts for likely participants in each others WGs

Some have been swapped.
More to do

2009-09-15-1

David T

Open

GSA agrees to develop a table to identify relationship and gaps
among the assurance profiles (of the schemes approved/adopted)
covering the various different protocols, conformance bodies etc

Terry to follow up. If not possible maybe release profiles for internationalising, unencumbered by IPR?

2009-09-15-2

Colin W

OBE

eGov WG to approach OSIS to ask if interested in entertaining the
testing of IOP for IOD and IC

OIF JSC has released an RFI for this

2009-09-15-3

All

Open

eGov WG to facilitate commentary on the OID and IC profiles from an international perspective

Initial review done Nov '09. Ongoing

2009-09-15-4

All

Open

Provide input to requirements for eGov Profile (SAML 2.0 SSO) V2.0
(next revision) by approx 21st Dec '09

Ongoing.  Nov/Dec email threads capture some issues, but need agreement on best treatment

2009-09-15-5

Colin W

Closed

Request LC to find a way to have multiple WGs communicate on
shared interests and topics (e.g. LoA)

LC has formed sub committee to review this. LC agenda altered to allow for X-group sharing at Chair/LC Rep level 

 

 

 

 

 

  • No labels